All in One Three Phase Advance Power System Experimentation Setup at NIT Mizoram


Here are some of the features of the Setup:

  • The Set-up comprises of artificial Short, Medium and Long Transmission Line(Total: 400 K.M. 100kn x 2 nos. and 200 K.M. x 1no. non saturate core line inductor) Operating voltage-0-415V, Load Current-10A, 50 Hz, Single Phase.
  • Standalone system capable of Generation Transmission & Distribution.
  • Parallel Operation between GRID & GENERATOR or GENERATOR & SOLAR
  • Active and Reactive Power measure with Transmission line and Infinite Bus.
  • Alternator synchronous method. Load sharing between Generator & Solar.
  • All line components (i.e. Resistance, Inductance & Capacitance) different tapping are easily accessible for externally connection by Armstrong’s Patch

 chords.

  • Synchronization Relay:- 3-Phase Numerical Type synchronized (Synchronized Between Grid source and inverter source and auto connected to feeder after the synchronization.
  • Feeder Protection:- Numerical Type Relay for feeder protection (i.e. Over Current, Earth Fault, Over Voltage and Under Voltage protection etc.) All data directly saved to PC and fault indication with alarm.
  • It has a Motorized type Variable Voltage Source for GRID with 0-415V, 10A, Three- phase (Isolated) with zero interlocking, short circuit & over load protection. And Power Analyzer : Digital multi-monitoring system (i.e. VA, W, VAR, Hz, A, V) Panel mount flash type, 96 mm X 96 mm, Aux. supply : 230V AC, Communication with RS485.
  • It has 3 Phase. 3H.P. SQIM mechanical pony break with Over load and Single phasing protection, Inductive Load: – 1Phase 230V/5Amp, 50Hz, AC, panel mount. Resistive Load: – 1Phase 230V/5Amp, 50Hz, AC, panel mount and Hybrid Inverter:- One 3 kVA, Input 24Volt DC and Output 415AC Star. Inverter low voltage high voltage and charging indication facility. with battery backup.
  • The setup has a Solar plant:- 3K.W. Roof top mount solar panel with all accessories -1set.
  • Three phase current and voltage taping option for Computer based data acquisition system at load end and multiple tapping options in transmission line for Advance DAQ system.
  • The Setup can be used Can used for load flow analysis, Relay control, Renewable energy experimentation, Load Switching, Source Switching, Transmission line familiarization and related experimentation (Short Medium Long range).

We have conducted 7 days of Detailed training program of each items for all the Faculties and Research Scholars of NIT Mizoram EE Dept. and we have got a very positive feedback from each one of them.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top